SM&A history-making moments

SM&A walks in a planned and steady rhythm. Along all the years since its foundation in the dawning of 2000, the company conquered a stepwise growth in the market scenery. To do so, it adopted a strict strategic plan enhancing the training of its team and acquired modern operational and managerial tools, which definitely traced its way to the remarkable success.

Timeline

2000

SM&A foundation with the outsourcing of the Holcim Brazil’s engineering team.

2002

First major project with the implementation of the Magnesita 20MW Thermal Station.

2003

First Harmonic Filter fully designed and built by SM&A for Refratec Magnesita.

2004

First work delivery as “package” provided to Holcim Pedreiras Cantareira in Magé/RJ.

2007

Preparation of the conceptual design for the steel plant in Jeceaba of VSB, 345kV – 3x140MVA.

2008

Implementation of the Diesel Cogeneration Plant of Holcim Brasil.

2009

Acquisition of Joule Engenharia and strengthening of the field service area.

2011

  • SM&A largest and most important industrial project then – VSB Jeceaba Steelworks Complex;
  • Certification according to ISO 9001 2008 Standard.

2012

Acquisition of the Doble testing stations for protective systems for Cemig’s Transmission Lines.

2014

First long term “umbrella” contract with VALE – Ferrosos Sul Board.

2015

  • Internationalization of the company;
  • Onset of services for Votorantim Cimentos in Turkey, Bolivia and United States of America;
  • ISO 9001 Recertification.